ASAP
stands for Accelerated SAP methodology which is used to implement and deliver
the project efficiently.
The
five stages of ASAP methodologies are-
Project plan, Business Blue print,
Realization, Final preparation & Go-Live - support.
1.
Project Preparation: In this phase the system landscape will be set up.
2.
Business Blueprint: It is a detailed documentation of your company's
requirements. (I.e. what are the objects we need to develop are modified depending
on the client's requirements).
3.
Realization: In this only, the implementation of the project takes place
(development of objects etc)
And
we are involved in the project from here only.
4.
Final Preparation: Final preparation before going live i.e. testing, conducting
pre-go-live, end user training etc.
End
user training is given that is in the client site you train them how to work
with the new environment, as they are new to the technology.
5.
Go-Live & support: The project has gone live and it is into production. The
Project team will be supporting the end users.
The
BW ASAP Methodology Implementation Project phases:
1.Project
Preparation / Requirement Gathering
2
Business Blueprint
3
Realization
4
Final Preparation
5
GO Live & Support
1.
Project Preparation / Requirement Gathering:
Collect
requirement thru interviews with Business teams /Core users / Information
Leaders.
Study
& analyze KPI’s (key figures) of Business process.
Identify
the measurement criteria's (Characteristics).
Understand
the Drill down requirements if any.
Understand
the Business process data flow if any.
Identify
the needs for data staging layers in BW – (i.e need for ODS if any)
Understand
the system landscape.
Prepare
Final Requirements Documents in the form of Functional Specifications
containing:
Report
Owners,
Data
flow,
KPI’s,
Measurement
criteria’s,
Report
format along with drilldown requirements.
2.
Business Blueprint:
Check
Business content against the requirements
Check
for appropriate
Info
Objects - Key figures & Characters
Check
for Info cubes / ODS
Check
for data sources & identify fields in source system
Identify
Master data
Document
all the information in a file – follow standard templates
Prepare
final solution
Identify
differences (Gaps) between Business Content & Functional
Specification,
Propose new solutions/Developments & changes if required at different
levels such as Info Objects, Info cube, Data source etc. Document the gaps
& respective solutions proposed– follow standard templates
Design
& Documentation
Design
the ERD & MDM diagrams for each cube & related objects
Design
the primary keys/data fields for intermediate Storage in ODS
Design
the Data flow charts right from data source up to Cube .
Consider
the performance parameters while designing data models
Prepare
High level / Low level design documents for each data model. --- follow
standard templates
Identify
the Roles & Authorizations required and Document it – follow standard
templates
Final
review of design with core BW users.
Sign
off the BBP documents
In
this phase you create a blueprint using the Question & Answer database
(Q&Adb), which documents your enterprise’s requirements and establishes how
your business processes and organizational structure are to be represented in
the SAP System. You also refine the original project goals and objectives and
revise the overall project schedule in this phase.
Functional
requirements should cover minimum of the below check list
Business
Objectives and Benefits
Business
Scope and Events
Business
Process Scope
Future
state process improvements
Business
KPI s
Reporting
Requirements
System/Client
Strategy Interface Requirements
Source
System Mapping
Field
availability (Master data + Transaction data)
Transformation
details
Data
availability frequency
Data
availability type
System
availability and Outage window
Data
load dependencies
History
Data Load availability
Data
Volume
Data
Reconciliation
Data
retention
Contingency
Planning
Authorizations
Transport
Strategy
Capacity
/Resource Planning
Gap
Analysis
Integration
and Policy/SOX consideration
Support
– Service Level support /Production support
Change
Management
Technical
requirements - Take a BI report ,translate functional requirements in to
technical design.
Map
KF, Characteristics, Free Char, RKF,CKF
3.
Realization
Check
& Apply Latest Patches/Packages ...in BW & R/3 systems.
Activate/Build
& enhance the cubes/ODS as per data model designs...maintain the version
documents.
Identify
& activate Info objects / Master data info sources / attributes ,prepare
update rules
Assign
data sources .prepare transfer rules , prepare multi providers . prepare Info
packages .
Perform
the unit testing for data loads….both for master data & transaction data .
develop
& test the end user queries .
Design
the process chains ,schedule & test
create
authorizations / Roles …assign to users ..and test
Apply
necessary patches & Notes if any .
freeze
& release the final objects to quality systems
perform
quality tests .
Re
design if required . (document changes, maintain versions)
4.
Final Preparations:
Prepare
the final check list of objects to be released .identify the dependencies &
sequence of release
Perform
Go Live checks as recommended by SAP in production system
Keep
up to date Patch Levels in Production system
Test
for production scenarios in a pre-production system which is a replica of
production system.
Do
not encourage the changes at this stage.
Freeze
the objects.
5.
GO Live & Support:
Keep
up to date Patch Levels
Release
the objects to production system
Run
the set ups in R/3 source system & Initialize Loads in BW
Schedule
Batch jobs in R/3 system (Delta loads)
Schedule
the process chains in BW.
Performance
tuning – on going activity
Enhancements
- if any
Very helpful resource. SAP HR Online Training
ReplyDelete